News

Instech Group awarded Design project work for SEAgas compressor station upgrade design

December 16, 2013

Instech Group has been awarded the design work associated with the upgrade of two of the SEAgas compressor station turbine upgrades. This work involves the turbine guide vane and bleed valve upgrades, new fire and gas system upgrade and compressor enclosure heater installations. The Instech group scope involves the design of all the interfaces required to install the turbine engine vendor supplied equipment including power supply and SCADA controls.

Filed under: Latest News — admin @ 4:18 am